Project · Marmato, Caldas

Non-domestic wastewater treatment system — Detox and WTP plants

Power, control, automation and instrumentation switchboards for the Detox and WTP plants of a non-domestic wastewater treatment system.

Client
Red de proyectos con Ingeniería (RPCI)
Year
2023
Location
Marmato, Caldas
A row of motor control centres installed in a plant building, with staff working in the background.

The challenge

The Detox and WTP plants of the non-domestic wastewater treatment system each needed their own power distribution, motor control centre and process control.

The response

Power distribution boards and motor control centres for Detox and WTP, control, automation and instrumentation panels for both plants, and marshalling cabinets, assembled and installed on site.

ITYP’s scope

Summary

Power, control, automation and instrumentation switchboards for the Detox and WTP plants of a non-domestic wastewater treatment system.

Process

Design and supply of the switchboards for both plants, control programming, FAT in the workshop, assembly and electrical installation, and SAT on site.

Technology and testing

Detox and WTP plants · Power distribution · Motor control centres · Control, automation and instrumentation

Gallery

Resultado

Both plants entered operation after commissioning and site acceptance testing; their switchboards had been delivered earlier, having passed factory acceptance testing in the workshop.