Project · Medellín, Antioquia
550 kVA substation upgrade
Upgrade of a 550 kVA substation, from the medium voltage down to the tertiary boards, power factor correction included.

The challenge
The operation needed to upgrade its 550 kVA substation and put the distribution in order from medium voltage down to the tertiary boards, power factor correction included.
The response
A 13.2 kV medium-voltage cubicle and SF6 protection cubicles for the 400 kVA and 150 kVA transformers; main distribution boards for both transformers, a 250 kVA secondary laboratory board, a 10 kVA regulated tertiary board and an automatic panel for the 50 kVAR power factor correction unit.
ITYP’s scope
- Design, supply, assembly and installation of medium-voltage cubicles, main, secondary and tertiary power distribution boards, and the power factor correction unit.
Summary
Upgrade of a 550 kVA substation, from the medium voltage down to the tertiary boards, power factor correction included.
Process
Design of the upgrade, supply of cubicles and boards, and assembly and installation on site.
Technology and testing
13.2 kV / 220 V · 400 kVA and 150 kVA transformers · SF6 protection cubicles · 50 kVAR power factor correction unit