ITYP — Ingeniería Total y Proyectos

Intelligent connections for a reliable future.

Projects

Project · Santa Marta, Magdalena

765 BHP fire-tube boiler

Power, control, automation and instrumentation switchboard for a 765 BHP fire-tube boiler.

Client
Calderas JCT
Year
2026
Location
Santa Marta, Magdalena

The challenge

The 765 BHP fire-tube boiler needed its own power, control, automation and instrumentation switchboard in order to run and be supervised.

The response

Motor control centre with variable frequency drives, control, automation and instrumentation panel, and marshalling cabinets.

ITYP’s scope

Summary

Power, control, automation and instrumentation switchboard for a 765 BHP fire-tube boiler.

Process

Manufacture of the switchboard, integration of the drives and the control system, wiring of the field signals and factory acceptance testing in the workshop before dispatch.

Technology and testing

765 BHP fire-tube boiler · MCC with variable frequency drives · Signal marshalling

Resultado

The switchboard was delivered after passing factory acceptance testing in the workshop, with the motor control centre, the boiler control and the field signals integrated into a single assembly.

A similar challenge in your project?

Message us on WhatsApp (opens in a new tab)